Rooftop MUGA - North London

News / Projects / Rooftop MUGA – North London

Rooftop Multi Use Games Area – North Brent School

Following a series of design meetings and discussions with the client’s drainage consultants Fieldform were contracted by Vertec Roofing and Cladding to construct a synthetic turf multi-use games area on the rooftop of a new build school.

This included:

  • Installation of separation membrane
  • Installation of drainage crates to provide additional stability
  • Installation and grading of an aggregate regulation layer
  • Installation of drainage cells
  • Installation of a specialist, fire tested shock pad
  • Installation of TigerTurf Evo Pro sand dressed carpet
  • Infilling and line marking.

Works for this project started in early 2023 and despite challenging conditions including high winds and heavy rain were completed within eight weeks. Our client, the main contractor and end users are delighted with the finished facility, this has created a vital outdoor space for the pupils of North Brent School.

More from our news

Industry

Contracts Manager Vacancy

Industry

Long Jump Facility

Industry

Sports Pitch Drainage

Projects

Resurfacing of Indoor Cricket Nets